Labor is an important factor when it comes to this process of installation as it is highly dependent on it. Although septic installation requires planning and perfect measurements, it is not a difficult task to undertake. Installing a tank which will be used for septic purposes is not that hard although it involves certain steps. These steps are supposed to be followed systematically for one to achieve the best results.
Before commencing on construction, one needs to obtain a permit from the local authorities. The basic construction process is that of creating a leveled space on which the tank will be laid. The requirements on constructing the septic vary widely across jurisdictions. It is advisable for one to seek the right information at the offices of the local authority before start the construction process.
Verification of the ordinances applying to a construction of this kind should be the first thing to do before installation begins. Authorities usually demand a certain length of the drainage line that will be coming out of the system. This usually depends on the soil surrounding the area in which the septic is to be constructed. When the soil is capable of absorbing more waste, the required length is less. A soil sample will be forwarded to authorities for the length to be determined.
The requirements on who should forward the soil sample are different across many jurisdictions. There are some which require the person to bring the sample and others who send government officials. Which the method is used in handing over the samples, the process should be carried out in advance. This usually helps in curbing constraints which may pop-up during construction. Failure to obtain the permit in time can negatively affect the process.
After one has acquired a permit, it is time to go and buy a septic tank. The tank can either be plastic or concrete. The plastic one is easier to transport and install as compared to the one made of concrete. The concrete ones are also more expensive and strenuous to install, but they are more durable and hard. There are retailers who offer installation cranes either at a fee or an after sales service offer. However, this is a crucial area and should first be discussed before the product is purchased.
There are various methods which one can use in digging the holes back at the construction site. One can either use a ditch witch or a backhoe, and one can also dig by hand. Renting digging equipment is optional. However, it is the most recommended method when it comes to time and cost of hiring laborers.
Many contractors choose hiring machinery to dig up the area. This saves on time and labor as well. Since the floor of the hole where the septic will be laid needs to be even, it is difficult to do this by the use of hands.
The last phase is quite easy and less time and resource consuming. One may use different construction materials to reinforce the base once it has been leveled. The drainage lines are usually set out in a very secure way after the tank has been lowered in place. The process of installation is considered as complete once the holes are filled and the glue applied has dried.
Before commencing on construction, one needs to obtain a permit from the local authorities. The basic construction process is that of creating a leveled space on which the tank will be laid. The requirements on constructing the septic vary widely across jurisdictions. It is advisable for one to seek the right information at the offices of the local authority before start the construction process.
Verification of the ordinances applying to a construction of this kind should be the first thing to do before installation begins. Authorities usually demand a certain length of the drainage line that will be coming out of the system. This usually depends on the soil surrounding the area in which the septic is to be constructed. When the soil is capable of absorbing more waste, the required length is less. A soil sample will be forwarded to authorities for the length to be determined.
The requirements on who should forward the soil sample are different across many jurisdictions. There are some which require the person to bring the sample and others who send government officials. Which the method is used in handing over the samples, the process should be carried out in advance. This usually helps in curbing constraints which may pop-up during construction. Failure to obtain the permit in time can negatively affect the process.
After one has acquired a permit, it is time to go and buy a septic tank. The tank can either be plastic or concrete. The plastic one is easier to transport and install as compared to the one made of concrete. The concrete ones are also more expensive and strenuous to install, but they are more durable and hard. There are retailers who offer installation cranes either at a fee or an after sales service offer. However, this is a crucial area and should first be discussed before the product is purchased.
There are various methods which one can use in digging the holes back at the construction site. One can either use a ditch witch or a backhoe, and one can also dig by hand. Renting digging equipment is optional. However, it is the most recommended method when it comes to time and cost of hiring laborers.
Many contractors choose hiring machinery to dig up the area. This saves on time and labor as well. Since the floor of the hole where the septic will be laid needs to be even, it is difficult to do this by the use of hands.
The last phase is quite easy and less time and resource consuming. One may use different construction materials to reinforce the base once it has been leveled. The drainage lines are usually set out in a very secure way after the tank has been lowered in place. The process of installation is considered as complete once the holes are filled and the glue applied has dried.